"According to the report, Priscilla Chan and Mark Zuckerberg providing financing that allowed the Center for Tech and Civic Life to offer nearly $9 million in “Zuck Bucks” to Milwaukee, Madison, Racine, Kenosha and Green Bay counties. In exchange, the “Zuckerberg 5,” as the report called the counties, in effect, operated Democratic get-out-the-vote efforts. Those grant funds then paid for illegal drop boxes to be placed in Democratic voting strongholds."
Report: Zuckerberg’s Election Money Violated Wisconsin Bribery Laws
That's one of the many troubling findings in the report submitted Tuesday by a state-appointed special counsel to the Wisconsin Assembly.
https://thefederalist.com/2022/03/01/breaking-special-counsel-finds-mark-zuckerbergs-election-money-violated-wisconsin-bribery-laws/
07:41 PM - Mar 01, 2022
Only people mentioned by Duende in this post can reply
Freedom Fighter
@JRFREEDOMFIGHTER
03 March, 10:54
In response John Atkison to his Publication
Interesting! Yesterday I tracked the President's plane with no callsign toSuperior Duluth. A B752 REG 09-0016 followed and landed at Minneapolis. Both returned to Joint Base Andrews later.
82-8000 landed around 18:05 GMT. The shot with the F35 (which does amazing things!) was 23:09 with AF1 nearing DC.
Two other B742 E-B (DOomsday planes) were flying too, GORDO14 landed at Lincoln where GORDO15 (ORDER66) was already stationary but it disappeared. CLUB25 was initially at Tampa, a location I haven't seen a B742 at before. The F35 I tracked a year ago, it appeared to go from the west coast to Holland in a very short time, at around 13k mph! Yesterday it zipped from one side of the US to the other in around 2 minutes, I think that's impossible but I saw it moving south of DC before it 'zipped'. Around 2,300 miles! It did that twice.
82-8000 landed around 18:05 GMT. The shot with the F35 (which does amazing things!) was 23:09 with AF1 nearing DC.
Two other B742 E-B (DOomsday planes) were flying too, GORDO14 landed at Lincoln where GORDO15 (ORDER66) was already stationary but it disappeared. CLUB25 was initially at Tampa, a location I haven't seen a B742 at before. The F35 I tracked a year ago, it appeared to go from the west coast to Holland in a very short time, at around 13k mph! Yesterday it zipped from one side of the US to the other in around 2 minutes, I think that's impossible but I saw it moving south of DC before it 'zipped'. Around 2,300 miles! It did that twice.
Notice: Undefined index: tg1tga_access in /home/admin/www/anonup.com/themes/default/apps/timeline/post.phtml on line 396
John Atkison
@Duende
03 March, 09:13
In response Freedom Fighter to her Publication
Either the F35 in question has a unique propulsion system or maybe what was broadcasting as a F35 was in actuality a TR-3B. Lots of videos out there that reportedly show a TR-3B doing some really strange things.
The Navy has a patents that some have speculated might be the propulsion system used in that craft.
https://www.thedrive.com/t...
The Navy has a patents that some have speculated might be the propulsion system used in that craft.
https://www.thedrive.com/t...
Navy's Advanced Aerospace Tech Boss Claims Key 'UFO' Patent Is Operable
Navy officials claim their radical electromagnetic and superconductor technologies aren't theoretical, they’re already operable in some form.
https://www.thedrive.com/the-war-zone/29232/navys-advanced-aerospace-tech-boss-claims-key-ufo-patent-is-operableNotice: Undefined index: tg1tga_access in /home/admin/www/anonup.com/themes/default/apps/timeline/post.phtml on line 396
Only followers of this user (CamdenBeach) can see their posts